nion tower

Europaallee 65–67
60486 Frankfurt am Main (DE)

Wettbewerb, 1. Preis
Competition, 1st Place

Vor kurzem kürte die Wettbewerbsjury den Siegerentwurf für einen neuen Büroturm in Frankfurt. Von UNStudio entworfen, wird das 106 Meter hohe Gebäude im Stadtentwicklungsgebiet Europaviertel errichtet. Das Thema Nachhaltigkeit hat im Konzept für den NION Tower dabei besonderen Stellenwert. Hochform erstellte die Kostenermittlung und unterstützt als lokaler Partner. Die Fertigstellung des Hochhauses ist für Anfang 2026 geplant.

Recently, the competition jury selected the winning design for a new office tower in Frankfurt. Designed by UNStudio, the 106-meter-high building will be erected in the urban development area Europaviertel. The topic of sustainability is of particular importance in the conception of NION Tower. Hochform calculated the costs and furthermore supports as local partner. Completion of the high-rise is scheduled for early 2026.

Mit über 100 Metern Höhe, besteht das zukünftige Gebäude aus einem Sockelbereich mit sechs und dem Turmbereich mit 26 oberirdischen Geschossen. Die flexiblen Grundrisse können sich mit den Bedürfnissen der Nutzer:innen mitentwickeln und ermöglichen so eine langfristige Effizienz bei der räumlichen Bespielung des Turms.

Sowohl ökologische als auch soziale Aspekte, als auch der Einsatz von recycelbaren und kreislauffähigen Baumaterialien, werden in der Konzeption des Büroturms berücksichtigt. Der Sockelbereich ist semi-öffentlich und beherbergt neben noch nicht näher definierten Freizeit-Angeboten, ein Café sowie Ateliers. Der denkmalgeschützte Wasserturm im Park davor bleibt erhalten und soll zum Bindeglied der umgebenden Nachbarschaft werden.

Eine modulare Tragstruktur und die Verwendung vorgefertigter Bauteile beschleunigen die Errichtung zusätzlich und verbessern so auch den ökologischen Fußabdruck. Die intensive Begrünung, sowohl im Innenraum als auch an der Fassade, fördert die Biodiversität, sorgt für angenehmes Raumklima und eine Platin-Zertifizierung durch die Deutsche Gesellschaft für nachhaltiges Bauen. Neben einer mit Photovoltaik ausgerüsteten Fassade sollen unter anderem auch ressourcensparende Regenwasserauffangsysteme und Aufzüge mit Energierückgewinnung eine möglichst nachhaltige Nutzung ermöglichen.

With a height of over 100 meters, the future building consists of a base area with six floors and the tower area with 26 floors. The flexible floor plans can evolve with the needs of its users and thus enable long-term efficiency in the spatial usability of the tower.

Ecological and social aspects, as well as the use of recyclable building materials, are taken into account in the design. The base area is semi-public and houses leisure facilities that have not yet been defined in detail, a café, and studios. The heritage-protected water tower in the adjacent park will be preserved and will become a link to the surrounding neighborhood.

A modular structural framework and the use of prefabricated components accelerate the construction process and thus improve the ecological footprint. Intensive greening, both in the interior and on the facade, promotes biodiversity, ensures a pleasant indoor climate and the platinum certification by the German Council for Sustainable Building. In addition to a facade equipped with photovoltaics, resource-saving rainwater collection systems and elevators with energy recovery, among other features, the tower is designed to ensure the most sustainable use possible.

In Kooperation mit

UNStudio (Entwurf, Projektleitung)


Kategorie

Bürobau


Art des Bauvorhabens

Neubau


Projektstatus

Laufend


Auftraggebend

Groß & Partner


Planungszeitraum

Seit 2023


Gebäudedaten

Grundstücksfläche: 3.215 m²

Gebäudevolumen: ca. 187.000 m³

Bruttogrundfläche: 43.500–45.000 m²


Zertifizierungen

Platin zertifiziert – Deutsche Gesellschaft für Nachhaltiges Bauen (Entwurf)


Leistungen

Unterstützung bei Wettbewerbsentwurf

Kostenermittlung 

Lokale Unterstützung 


Team

Projektleitung: Damian Witt


Fachberater:innen (Wettbewerbsphase)

Struktur und Fassade: Bollinger+Grohmann

Haustechnik und Energiedesign: 

KBP Ingenieure GmbH

Brandschutz: HHP Berlin

Landschaftsplanung: OKRA Landschapsarchitecten BV


Visualisierungen 

CGI: MOARE / © UNStudio

In cooperation with

UNStudio (design, project lead)


Category

Office building


Type of implementation

New building


Project state

Ongoing 


Client

Groß & Partner


Planning period

Since 2023


Building data

Plot size:: 3,215 m²

Building volume: ca. 187,000 m³

Gross floor area: ca. 43,500–45,000 m²


Certificates

Platin certified – Deutsche Gesellschaft für Nachhaltiges Bauen (DGNB)


Service

Cost calculation 

Local support


Team

Project lead: Damian Witt


Consultants (competition phase)

Structure and Facade: Bollinger+Grohmann

Building services & energy design: 

KBP Ingenieure GmbH

Fire safety engineer: HHP Berlin

Landscape architecture: OKRA Landschapsarchitecten BV


Visualizations 

CGI: MOARE / © UNStudio

ähnliche projekte.

the spin

the spin

zebra deloitte

zebra deloitte

grand tower

grand tower

Frankfurt am Main (DE)

Wettbewerb, 1. Preis

Frankfurt am Main (DE)

Frankfurt am Main (DE)

bottom of page