zebra deloitte.

Europaallee 91

60327 Frankfurt (DE)

In the new Frankfurt European Business District, the new office building “Zebra” is being built as the new headquarters for the testing and consulting company Deloitte. In the 7-storey building with a gross floor area of 30,000 m², innovative office space and multifunctional areas will be erected.

Project category

New-built

Client

Aurelis Real Estate Service GmbH

Planning period

2018​

Construction period

since 2019

Building data

Plot size: 4,576 m²
Built up area: 3,286.07 m²
Gross floor area: 28,572 m²
GRZ: 0.63
Gross volume: 98,977.80 m³

Services

Developed design

Approval planning

Technical design

Tender

Status

Technical design

Construction work

Team

Project director: Damian Witt
Project leader: Giuseppe Zagaria / Günther Weber
Project team: Nadine Lorius, Denise Sokolowski, Majed Naseri, Patrick Olczykowski, Akram Hilal, Severin Türk, Severin Goidinger, Maria Letizia Martani, Sabina Riss, Dieter Segerer, Yann Riedel, Ignacio Leal  

Consultants and specialist planners

Structural engineer: Boll & Partner
Building physics: Rekowski und Partner
Building services: IPP Technische Gesamtplanung AG
Electrical engineering: TP Elektroplan
DGNB-Zertifizierung: Werner Sobek
Fire safety engineer: Hilla Wichert Brandschutzsachverständige
Façade consulting: Christian Bonik Fassadenberatung
Surveyor: Dirk Blaurock
Open space planning: Hofmann_Röttgen Landschaftsarchitekten

Lighting design: Kardorff Ingenieure Lichtplanung

Interior Design: Kinzo, Caspar Mohrkramer Architekten

Website

Europaviertel Frankfurt

Space concepts for new office worlds are created in cooperation with renowned interior designers. The spacious foyer also serves as an event zone. The ground-floor conference area for 200 people including a catering area can be used flexibly. The attractive green and open space concept comprises spacious terraces for communication and movement on the 1st floor and atriums on the ground floor. The perforated metal façade surrounding the building characterises the unmistakable appearance on Frankfurter Allee. The building will be constructed to the highest ecological standard and LEED certification will be sought.

 

The use of Open BIM standards enables a more efficient exchange of data between all planners involved and the optimisation of coordinative and planning challenges.

 

The planned move is in the 4th quarter of 2021.

related projects.

EUROTOWERSitzungssaal.jpg

eurotower.

60311 Frankfurt (DE)

Corporate HQ.jpg

corporate headquarter.

Study

1100 Vienna (AT)

Follow us

  • hochform. Facebook
  • hochform. Instagram